EmissionsLookup
Non-Compliance TRI Reporter Clean Air Act Clean Water Act RCRA

AECI DELL POWER PLANT

Quick Summary

  • Released 29,221 lbs of toxic chemicals to the environment in the most recent TRI reporting year.
  • Currently out of compliance in at least one environmental program (CAA, CWA, or RCRA).
  • Assessed $0 in total penalties since records began.
  • Reports releases of chemicals classified as known or probable carcinogens.
Address
301 E. STATE HIGHWAY 18
DELL, AR 72426
View on map ↗
County
MISSISSIPPI County
Industry
Utilities
NAICS (North American Industry Classification)
221112
Inspections
7 · last May 8, 2025
Total Penalties
$0 · last Jul 23, 2015
Registry ID
110043716565

How This Compares

#70 of 316 TRI reporters in AR
#357 of 584 TRI reporters in Utilities

Ranked by most recent year's total TRI releases.

Compliance Status (Last 12 Quarters)

Number of calendar quarters, out of the last 12, in which this facility was in violation of its permit. Zero means no recorded violations in that program over the past three years.

0
Air (CAA)
Qtrs Non-Compliant
1
Water (CWA)
Qtrs Non-Compliant
0
Hazardous Waste (RCRA)
Qtrs Non-Compliant

TRI Toxic Chemical Releases

Annual pounds of each toxic chemical released to air, water, and land, as reported to the EPA Toxic Release Inventory. Carcinogen (♦) and PFAS designations are per EPA and IARC classifications.

Emissions Trend (2023–2024) +83% overall
Year Total Releases (lbs) vs Prior Year
2023 16,011
2024 29,221 +83%

2024

Chemical Total (lbs) Air Water Land Off-Site
Ammonia 29,000 29,000
Polycyclic aromatic compounds 130 130 ♦ Carcinogen
Naphthalene 91 91 ♦ Carcinogen

2023

Chemical Total (lbs) Air Water Land Off-Site
Ammonia 16,011 16,011

Waste Management & Recycling

How this facility manages toxic chemicals beyond direct releases — through recycling, energy recovery, and on-site or off-site treatment. Data from the most recent TRI reporting year. Quantities in pounds.

Chemical Released Recycled Energy Recovery Treated

Compliance Violations

Individual permit violations recorded by the EPA across air, water, and hazardous waste programs. Open violations are unresolved as of the most recent ECHO data update.

Program Type Violation Date Return to Compliance Status
cwa Schedule Event achieved late but reported Mar 31, 2025 Open
cwa Schedule Event reported late Mar 1, 2025 Open
cwa Schedule Event achieved late but reported Mar 1, 2025 Open
cwa Schedule Event unachieved but reported Mar 1, 2025 Open
cwa Schedule Event unachieved and not reported Mar 1, 2025 Open
cwa Schedule Event unachieved but reported Jan 25, 2025 Apr 14, 2025 Resolved
cwa Schedule Event unachieved and not reported Jan 25, 2025 Apr 14, 2025 Resolved
cwa Schedule Event reported late Jan 25, 2025 Open
cwa Schedule Event achieved late but reported Jan 25, 2025 Open
cwa Permit Violations - Failure to Submit Timely Permit Renewal Application Mar 4, 2021 Open

Discharge Limit Exceedances

Instances where this facility's reported discharge monitoring results exceeded its permitted limits under the Clean Water Act. Exceedance percentage shows how far over the permit limit the discharge was.

Pollutant Violation Reported Limit Exceedance Period Status
Copper, total recoverable DMR, Limited - Numeric Violation 0.10 mg/L 0.06 +71% Mar 2022 Open
Copper, total recoverable DMR, Limited - Numeric Violation 0.27 kg/d 0.14 +100% Mar 2022 Open
Copper, total recoverable DMR, Limited - Numeric Violation 0.15 kg/d 0.13 +10% Mar 2021 Open
Copper, total recoverable DMR, Limited - Numeric Violation 0.20 kg/d 0.13 +48% Nov 2020 Open
Copper, total recoverable DMR, Limited - Numeric Violation 0.08 kg/d 0.06 +21% Nov 2020 Open
Copper, total recoverable DMR, Limited - Numeric Violation 0.04 mg/L 0.03 +22% Nov 2020 Open
Copper, total recoverable DMR, Limited - Numeric Violation 0.10 mg/L 0.06 +71% Nov 2020 Open
Solids, total suspended DMR, Limited - Numeric Violation 40.00 mg/L 13.80 +190% Nov 2019 Open
Solids, total suspended DMR, Limited - Numeric Violation 40.00 mg/L 38.50 +4% Nov 2019 Open

Enforcement Actions

Formal enforcement cases brought by the EPA or state agencies, including administrative orders and civil penalties assessed. Penalty amounts reflect what was formally assessed, not necessarily what was collected.

State Administrative Order of Consent
Clean Water Act · Case AR-9973 - CAO · Oct 26, 2021
Administrative - Formal
· Case 06-2015-3338 · Jul 23, 2015
$30,000

Other facilities in MISSISSIPPI County, AR

NIBCO - BLYTHEVILLE DIVISION
BLYTHEVILLE, AR · Manufacturing
WILSON WATER SYSTEM
WILSON, AR
ARKANSAS STEEL PROCESSING
OSCEOLA, AR · Manufacturing
LUXORA WATERWORKS
LUXORA, AR
RAZORBACK CONCRETE PLANT #107
BLYTHEVILLE, AR · Manufacturing
All facilities in AR →